The Big Letter Co.

Handoff Note

A written handoff tells the next team what was built, what still needs approval and what has to reach the venue.

A man inspects large white freestanding letters in a workshop with dark floors and stacked materials.

Details that must travel

Wherever the job goes next, four details go with it:

  • Venue, date, and load-in window listed
  • Current workshop photo included
  • Latest artwork file named and linked clearly
  • Contact details exactly as the client supplied them

Dimensions, finishes, packing notes and the last approved artwork move from one person to the next during handoff, including between delivery, strike and on-site setup teams.

A complete handoff note

Delivered letters, signage and install information all go in the note, so the receiving team knows what is arriving, where items go and what needs checking on site.

Job notes must travel with all relevant details: return depth, paint finish, fixings, base plates, and height, along with any venue rules on loading bays and access times.

Workshop photos of the packed load and finished pieces help the next team visualise what will arrive, which makes setup on site more straightforward.

Items and instructions the next team receives

Enough detail must reach the incoming team so they can place, assemble and inspect the work correctly. That usually means dimensions, artwork revision, finish notes, packing count, venue contact details and any unresolved approval. One well-written note often prevents confusion better than a long trail of mixed messages.

The transfer note must match the latest venue plan and approved artwork. The final pass should include letter faces, edges, paint, vinyl application and any hardware packed with the job. The next team receives a short set of items:

  • Packing list matched to delivered items
  • Final condition photo taken before departure
  • Named contacts for delivery and site

Handoff notes for each venue

A handoff for event work needs to reflect the real constraints at each venue. Rigging limits, narrow access points or mall rules should be included before the job moves on.

Key records for a written handoff

Artwork records, measurement notes and any install sketch for the venue should stay with the handoff. The receiving team then has a single place to check what was approved, what was built and what still needs a site decision.

What our Sign Lettering customers say

Verified Google reviews

Tell us about your venue and wording

Send the wording, the venue and the date, and we will come back with practical letter options, materials and an install plan.

Start your brief